UCC 4 Form

This field is for validation purposes and should be left unchanged.

APPLICATION FOR UCC DEMOLITION PERMIT

Check that applies

Site Information

Political Subdivision and County names are required.
With or without foundation
Is it in a flood plain
Is it in a flood way
Will there be a rebuild after demolition?

Site Plan Requirements

  • Location of all buildings or structures to be demolished, distances to property lines and distances to sidewalks, pavement and curbs where they abut property lines.

  • Location of any existing buildings or structures that will remain on the site.

  • Area to be filled to existing grade and seeded or to be fenced and otherwise protected in anticipation of new construction.

  • If applicable, location, dimensions and construction details for pedestrian protections required in section 3306 of the International Building Code.

Owner and Applicant Information

Property Owner

Owner Statement

I/we, signed name(s)] certify that I/we own the property described above for which this application is made for a UCC demolition permit and that the applicant has my/our approval to demolish this property or act as our agent in the demolition of this property.

Drop files here or
Max. file size: 1 GB, Max. files: 10.

    Invoice & Payment

    Enter the name and the mailing address or email address the invoice should go to. Payment can be made by check (mailed or dropped off at our office) or by card.